Three-layer high-performance flat roof system installed in Chelmsford
Job Description: Lead Box Gutter Installed
Location: Chelmsford, Essex
This new 3-layer high-performance flat roof system was supplied and installed over an existing failing asphalt roof in Chelmsford, Essex. The stunning finish on this new flat felt roof (in a charcoal mineral finish) comes with a full 20-year guarantee.
Fitted using a blowtorch (amongst other tools!), a 3-layer felt roof system benefits from being more stable than the older methods used with felt roofs. Each layer is laid in a half-lap system, so any joint in the roof is as far away as possible from the next joint.
This is a versatile system when it comes to appearance. If you are looking for a more colourful finish, or something reflective, it’s easily achieved with this system.
The 3-layer torch-on felt roof system is also much more durable than older felt roof systems.